← All use cases

Product & engineering

96 stable releases in 20 days in parallel

Prerequisite
Issues → Items + Shared Space
20-day output
96 stable releases
Urgent fix
2h 42m to tested PR

The finished work

Full-UI overview of parallel channel dispatch, 20-day shipping ledger and same-day PR merge.

Landscape 16:9

How it got made

What was asked, word for word

Sync today's community bug reports and open repo issues into Items, then split 3 isolated worktree tracks in parallel: (1) reproduce and fix the routing fallback bug with unit tests, (2) finish cross-device workspace sync, and (3) run full regression checks. Post the passing PR summary card back to the channel for merge sign-off.

  1. Prerequisite 1: import repo issues and user requests directly into Work Items with routing rules.

    Prerequisite 1: import repo issues and user requests directly into Work Items with routing rules.
  2. Prerequisite 2: turn on Collab Space in Members so Mira Bot dispatches work across every role.

    Prerequisite 2: turn on Collab Space in Members so Mira Bot dispatches work across every role.
  3. Prerequisite 3: keep concurrent sessions unlimited in Space settings so parallel PRs never queue.

    Prerequisite 3: keep concurrent sessions unlimited in Space settings so parallel PRs never queue.
  4. Step 4: isolated worktrees run bug fixes and features side by side with live Git diff review.

    Step 4: isolated worktrees run bug fixes and features side by side with live Git diff review.
  5. Step 5: CI and security scans pass; click the one-tap merge card in-thread to ship same day.

    Step 5: CI and security scans pass; click the one-tap merge card in-thread to ship same day.